Maintenance work

Maintenance work are conducted on link between GUM - Warsaw and AOS - Borowiec near Poznan. Link can be worked unstable during next few days. We will publish a next information when link will return to stable work.

OPTIME was presented on KSTiT 2013

Project OPTIME was presented on conference KSTiT 2013 on 4-6 September 2013 in Gdańsk, Poland. The materials from this conference can be found on here.

OPTIME on IFCS-EFTF Symposioum in Prague 2013

The OPTIME project was presented on IFCS-EFTF Symposioum in Prague. Project partners have shown two posters (poster 1, poster 2) on the Poster Sesions. Moreover one of the project participants - dr Jerzy Nawrocki from AOS - has presented a 500 days working link between GUM in Warsaw and AOS in Borowiec.

OPTIME on TNC 2013

The OPTIME project was presented on TERENA Networking Conference 2013 (TNC) in Maastricht, Netherlands. The poster with main information about project was shown on a booth PSNC.

OPTIME will be on Poster Presentation IFCS-EFTF Symposium in Prague

OPTIME project will be present in Prague on IFCS-EFTF Symposioum with paper "OPTIME - time and frequency dissemination system based on fiber optical network PIONIER"

2nd cooperation meeting in Warsaw

All partners met together at TPSA building in Warsaw, Poland on 10 of January 2013. It was the second face-to-face meeting. The main topic of the meeting was architecture of the OPTIME system. Partners focused on method of access and management transmissions devices.

Kick-off meeting in Poznan

All partners met together at PSNC headquarters in Poznan, Poland on 4-5 of December 2012. It was the first general project meeting and its purpose was to initiate the work of all partners by letting them discuss in person and organize cooperation schemes. All the work packages were introduced and the most important issues were discussed.

OPTIME starts

Project OPTIME starts 1 December 2012.